EPLL - Łódź
Aerodrome general information
Aerodrome general information
| ARP | Localization | Elevation |
|---|---|---|
| 52° 09' 57'' N 020° 58' 02'’ E | 3.2 NM from city centre | 607 ft |
Aerodrome category for firefighting: CAT 7 ICAO
Runway characteristics
|Designations|True bearing|Magnetic bearing|Runway dimensions (m)|SWY dimensions (m)|Strip dimensions (m)|RESA (m)| |-|-|-|-|-|-| |07|071°|065°|2500 x 45|NIL|2620 x 280|210 x 90| |25|251°|245°|2500 x 45|NIL|2620 x 280|120 x 90|
Declared distances
| Runway | TORA (m) | TODA (m) | ASDA (m) | LDA (m) | Remarks |
|---|---|---|---|---|---|
| 07 | 2500 | 2560 | 2500 | 2500 | NIL |
| 25 | 2500 | 2560 | 2500 | 2500 | NIL |
Air traffic services airspace
| Airspace designations | Vertical limits | Airspace classification | ATS unit | Transition altitude |
|---|---|---|---|---|
| ŁÓDŹ CTR | GND - 1700 ft | D | ŁÓDŹ TOWER (124.230 MHz) | 6500 ft |
Radio navigation and landing aids
| Type | ID | Frequency/channel |
|---|---|---|
| DME 25 | LOD | CH 42X |
| DVOR/DME | LOZ | 112.400 MHz / CH 71X |
| ILS GP 25 | - | 329.600 MHz |
| ILS LOC 25 | LOD | 110.500 MHz |
Local aerodrome regulations
The Delivery/Tower Controller provides information about the initial climb, which is 6000 ft, except when other aircraft are expected over the LOZ VOR – the initial climb altitude should be coordinated with APP Warszawa.
Datalink clearance
Datalink clearances on Radom airport are not available.
Ground movement procedures
Startup clearance is issued by ŁÓDŹ DELIVERY.
Departing traffic does not require pushback. They taxi out of the stand after startup.
Aircraft DE-ICING
De-icing stand for aircraft is designated on stand 12. Is is available for aircraft ICAO Code A, B and C. De-icing of aircraft ICAO Code D might be carried out at parking stand.
VFR traffic
VFR flights in CTR Łódź are required to have a flight plan. VFR flights in the CTR EPLL should follow published VFR routes.
During periods of high air traffic intensity, an aircraft operating under VFR may, if necessary, be instructed to hold according to the appropriate procedure over the following points:
- point NOVEMBER - to the north side of the aerodrome,
- point SIERRA - to the south side of the aerodrome,
- point BRAVO - to the south side of the aerodrome. All holdings must be performed at an altitude of 2000 ft AMSL, according to PANSA eAIP IFR AD 2 EPLL 2.22.2.6.
The standard (cruise) altitude for VFR traffic in the CTR EPLL is 1500 ft.
Low Visibility Procedures (LVP)
LVP operations will be commenced when any of the RVR falls below 550 m and/or the cloud ceiling falls below 200 ft. Pilots are informed about LVP being in operation via ATIS or by radio, with use of following phraseology: “Low visibility procedures in operation.”
At EPLL aerodrome LVP procedures are applicable only to Low Visibility Take Off (LVTO). LVP will be terminated when all of the RVR increase over 600 m and the cloud ceiling reaches 200 ft or more and a continuing improvement is anticipated.
| Phase | RVR | Cloud ceiling or VV |
|---|---|---|
| Preparation | ≤ 800 m | ≤ 300 ft (90m) |
| LVP | < 550 m | < 200 ft (60m) |
| Suspension | ≥ 600 m | ≥ 200 ft (60m)* |
*continuing improvement is anticipated
Minimum RVR for departure is 400 m.
| Operation | RVR |
|---|---|
| Departure | ≥ 400 m |
| Arrival | ≥ 550 m (No LVP for arrivals) |