Skip to main content
Version: 2606

EPSY - Olsztyn - Mazury

Aerodrome general information

ARPLocalizationElevation
51° 14' 21'' N 022° 42' 51'' E40 NM southeast from city centre465 ft

Aerodrome category for firefighting: CAT 5 ICAO

Runway characteristics

|Designations|True bearing|Magnetic bearing|Runway dimensions (m)|SWY dimensions (m)|Strip dimensions (m)|RESA (m)| |-|-|-|-|-|-| |01|018°|014°|2500 x 45|NIL|2760 x 280|240 x 120| |19|198°|194°|2500 x 45|NIL|2760 x 280|240 x 120|

Declared distances

RunwayTORA (m)TODA (m)ASDA (m)LDA (m)Remarks
012500250025002500NIL
192500250025002500NIL
19200320032003NILINTERSECTION TAKE OFF TWY P
19200020002000NILINTERSECTION TAKE OFF TWY B
19174517451745NILINTERSECTION TAKE OFF TWY R

Air traffic services airspace

Airspace designationsVertical limitsAirspace classificationATS unitTransition altitude
Olsztyn-Mazury CTRGND - 1500 ftDMAZURY TOWER (118.030 MHz)6500 ft
OLSZTYN/Mazury ATZGND - 5500 ftGMAZURY INFORMATION (118.030 MHz)6500ft

Radio navigation and landing aids

TypeIDFrequency/channel
DME 01SZYCH 18X
DVOR/DMESYN111.050 MHz / CH 47Y
ILS GP 01-334.700 MHz
ILS LOC 01SZY108.100 MHz

Local aerodrome regulations

Datalink clearances at the Olsztyn-Mazury airport are not available.

Ground movement procedures

Apron 2 and Apron 3 are only for General Aviation aircraft.

Aircraft DE-ICING

Aircraft de-icing is available on APN 1 - not more than one aircraft at the same time - with engines turned off only.

VFR traffic

During high traffic load, aircraft in VFR flight may be instructed to hold on one of the published holdings: — on the east side of the aerodrome ECHO, — on the west side of the aerodrome WHISKEY.

Low Visibility Procedures (LVP)

LVP operations will be commenced when any of the RVR falls below 550 m and/or the cloud ceiling falls below 200 ft.

Pilots are informed about LVP being in operation via ATIS or by radio, with use of following phraseology: “Low visibility procedures in operation. CAT II in operation”.

If weather conditions does not allow CAT II approaches the following phraseology should be used instead: “Low visibility procedures in operation. CAT II not available”.

LVP will be terminated when all of the RVR increase over 600 m and the cloud ceiling reaches 200 ft or more and a continuing improvement is anticipated.

PhaseRVRCloud ceiling or VV
Preparation≤ 800 m≤ 300 ft (90m)
LVP< 550 m< 200 ft (60m)
Suspension≥ 600 m≥ 200 ft (60m)*

*continuing improvement is anticipated

During LVP both RWY 01 and RWY 19 can be used for departure. Pilots are required to report runway vacation upon doing so.

Minimum RVR for departure is 150 m.

OperationRVR
Departure≥ 150 m
Arrival (RWY 01)≥ 300 m (CAT II)