Skip to main content
Version: 2609

EPSC - Szczecin - Goleniów

Aerodrome general information​

ARPLocalizationElevation
53° 35' 05'' N 014° 54' 07'' E30 NM northeast from city centre156 ft

Aerodrome category for firefighting: CAT 9 ICAO

Runway characteristics​

DesignationsTrue bearingMagnetic bearingRunway dimensions (m)SWY dimensions (m)Strip dimensions (m)RESA (m)
13131°127°2500 x 45NIL2620 x 30090 x 120
31311°307°2500 x 45NIL2620 x 30090 x 120

Declared distances​

RunwayTORA (m)TODA (m)ASDA (m)LDA (m)Remarks
132500250025002500NIL
312500250025002500NIL

Air traffic services airspace​

Airspace designationsVertical limitsAirspace classificationATS unitTransition altitude
SZCZECIN/Goleniów CTRGND - 1700 ftDSZCZECIN TOWER (121.255 MHz)6500 ft

Radio navigation and landing aids​

TypeIDFrequency/channel
DME 31SZCCH 42X
DVOR/DMESCE114.750 MHz / CH94Y
ILS GP 31-329.600 MHz
ILS LOC 31SZC110.500 MHz

Local aerodrome regulations​

Datalink clearances at the Szczecin airport are not available.

VFR traffic​

Constant (cruising) altitude and pattern altitude for VFR flights in CTR EPSC is 1500 ft. It is caused by dense buildings and high obstacles surrounding the airport. Flights shall not take place below that altitude.

Descent below 1500 ft is permitted only in close vicinity of the airport, during published holding procedures over VFR reporting points, approaches and runway operations.

During high traffic load, aircraft in VFR flight may be instructed to hold on one of the published holdings: — on the east side of the aerodrome NOVEMBER, — on the west side of the aerodrome SIERRA.

Low Visibility Procedures (LVP)​

LVP operations will be commenced when any of the RVR falls below 550 m and/or the cloud ceiling falls below 200 ft. Pilots are informed about LVP being in operation via ATIS or by radio, with use of following phraseology: “Low visibility procedures in operation.” LVP will be terminated when all RVRs increase to 550 m or above and ceiling rises above 200 ft and a continuing improvement is anticipated.

PhaseRVRCloud ceiling or VV
Preparation≤ 800 m≤ 300 ft (90m)
LVP< 550 m< 200 ft (60m)
Suspension≥ 550 m≥ 200 ft (60m)*

*continuing improvement is anticipated

During LVP operations RWY 13/31, TWYs B, C, H, R, J are available.

Minimum RVR for departure is 125 m.

Minimums for landing depends on the approach type chosen by PIC. After vacating the runway, pilot is obliged to report it to TWR controller.

OperationRVR
Departure≥ 125 m
ArrivalNIL