Skip to main content
Version: Upcoming release

EPLB - Lublin

Aerodrome general information​

ARPLocalizationElevation
51° 14' 21'' N 022° 42' 51'' E6 NM east from city centre637 ft

Aerodrome category for firefighting: CAT 7 ICAO

Runway characteristics​

DesignationsTrue bearingMagnetic bearingRunway dimensions (m)SWY dimensions (m)Strip dimensions (m)RESA (m)
07077°072°2520 x 45NIL2640 x 300180 x 90
25257°252°2520 x 45NIL2640 x 300180 x 90

Declared distances​

RunwayTORA (m)TODA (m)ASDA (m)LDA (m)Remarks
072520252025202520NIL
07127112711271NILINTERSECTION TAKE OFF TWY A
252520252025202520NIL
25127112711271NILINTERSECTION TAKE OFF TWY A

Air traffic services airspace​

Airspace designationsVertical limitsAirspace classificationATS unitTransition altitude
LUBLIN CTRGND - 1500 ftDLUBLIN TOWER (136.430 MHz)6500 ft

Radio navigation and landing aids​

TypeIDFrequency/channel
DME 25ISWICH 56Y
DVOR/DMESWI112.200 MHz / CH 59X
ILS GP 25-330.950 MHz
ILS LOC 25ISWI111.950 MHz

Local aerodrome regulations​

Datalink clearances at the Lublin airport are not available.

Ground movement procedures​

Stand 11 can be used as holding position for category D aircraft. Stand 10 is used for deicing.

TWYRESTRICTIONREMARKS

Aircraft DE-ICING​

De-icing is possible only on stand no. 10 with engines turned off.

VFR traffic​

During high traffic load, aircraft in VFR flight may be instructed to hold on one of the published holdings: — on the north side of the aerodrome TANGO, — on the south side of the aerodrome SIERRA.

Low Visibility Procedures (LVP)​

LVP operations will be commenced when any of the RVR falls below 550 m and/or the cloud ceiling falls below 200 ft.

Pilots are informed about LVP being in operation by radio, with use of following phraseology: “Low visibility procedures in operation. CAT II in operation”. If weather conditions does not allow CAT II approaches the following phraseology should be used instead: “Low visibility procedures in operation. CAT II not available”.

LVP will be terminated when all RVRs increase to 600 m or above and ceiling rises above 200 ft and a continuing improvement is anticipated.

PhaseRVRCloud ceiling or VV
Preparation≤ 800 m≤ 300 ft (90m)
LVP< 550 m< 200 ft (60m)
Suspension≥ 600 m≥ 200 ft (60m)*

During LVP for departure and landing only runway 25 should be used. Runway 07 can be used for departure on pilot request. After landing runway should be vacated via taxiway A and reported to ATC.

Minimum RVR for departure is 125 m.

OperationRVR
Departure≥ 125 m
Arrival (RWY 25)≥ 300 m (CAT II)